Bangladesh
New 132/33 kV Grid Substation in Roumari Expected to Increase Paddy Yield by 6,300 Tonnes
Installation of a new 132/33 kV power supply grid substation in Roumari upazila could resolve low voltage issues, enabling smooth operation of low-lift pumps and increasing paddy production by 6,300 tonnes annually.

